Even though each project is different, Pacadar typically works with on-site factories. Depending on the size of the works we can set up several factories along the alignment. This gives us competitiveness, in such a way that logistic costs are dramatically reduced compared with local manufactures with production facilities in distant locations.

We set up all manufacturing facilities inside the construction area in about 4 to 6 months, as a function of the type and quantity of structures to be manufactured.

Our factories are tailored- made solutions and depending on the nature and scope of the contract we can:

  1. Bring equipment’s and machinery from other on site facility.
  2. Establish a Joint Venture with a local company.
  3. Buy a local company.

Even being option 1 the most common, sometimes options 2 and 3 are required due to local regulations, permits or strategy.

During the quotation stage, our On Site Factory Design Department studies and designs the whole facility, just for the supply of this specific project, what means that Pacadar is going to work exclusively for one project and one client. This gives us a huge flexibility in order to match the client’s work schedule, either increasing or decreasing the production according to the client’s needs. We are able to set up a third shift solution or a 24 hours 7 day a week solution to catch up the new milestones required by the client, assuring an ahead of schedule production.

Our On Site Factories are 100% industrial facilities with manufacturing procedures, quality controls, testing labs, and all necessary equipments to guarantee scheduled deliveries and quality.